Operation and Maintenance of Bottle Blower
Dec 03, 2018

9632884845_1861229054

1. Preheating irradiates the preform (embryo) through infrared high temperature lamp tube, and softens the preform (embryo) part of the preform (embryo). In order to maintain the shape of the bottle mouth, the preform (embryo) mouth does not need heating, so a cooling device is needed to cool it.
2. Bottle blowing molding stage is to place the pre-heated preform (embryo) in the blowing mould, inflate it under high pressure, and blow the preform (embryo) into the required bottle. The automatic bottle blowing machine combines the two operations of the bottle blowing through the manipulator operation, eliminating the process of putting the preheated bottle blank (embryo) into the blowing die manually. The production rate has been greatly accelerated.
Operation specification
1. Lubricating oil must be added to each moving part before starting each shift. (Manipulator, Manipulator Guideway, Open and Close Mould Guideway)
2. The swing arm can be added once a day (3-4). The large chain and small chain of the heater can be used once a month. Check engine reducer and heater reducer frequently for oil shortage. The main bearing can be added once every three months.
3. Before production, check whether the moving parts are firm, whether the screw is loose and falling off, especially where the impact force is strong, whether the belt drive part is abnormal.
4. Check whether the high-pressure gas source, low-pressure gas source, power source and water source are normal.
5. Check the emergency stop switch, safety door switch and protective device to check whether the switch is normal.
6. Check whether the warming head enters the embryo and the embryo-dropping part works properly. If the insertion is not in place, the adjustable embryo pressing device nut can be used.
7. Check whether the lamp is damaged or broken. We need to change it in time.
8. Check whether the pneumatic components are leaking, and whether the action is sensitive.
9. Check whether the triplet leaks abnormally, whether it is blocked or not, whether the water cup is too full.
10. When the solenoid valve of the full-automatic bottle blower is abnormal, it should be cleaned in time 3.5 million per bottle